Figure 2-5. Stage 0, completely stowed structure 2.2.2 Stage 1 At this stage (Figure 2-6) the first layer on two opposite sides, which are furthest from the fixed link (shown in red in the top view) are deployed. Figure 2-6. Stage 1 2.2.3 Stage 2 At this stage (Figure 2-7), the second layer on the two opposite sides are deployed, Now two sides of the closed loop deployable structure are completely deployed.