PLATE IV (Upper)-A gully ready to undermine farm buildings. (Lower)-Method of controlling gully erosion. The log dam prevents further deeping of channel. (Note soil collected in gully channel.) (Courtesy of Soil Conservation Service, U. S. D. A.)