Most waves are dissipated after moving across the shallows of south Banner Day. The north shore of Benner Bay is heavily developed. Except for marinas along the northeast corner, most buildings are private dwellings. North of the Lagoon in the Bovoni- Nadir area, a fair-sized community is developing. Sewage from this community is treated in a 70,000 gpd.plant (Figure 15) located on the northwest shore of the Lagoon and the effluent drained to the shore. Long Point is undeveloped, although a small salt pond on its west shore, south of Stalley Bay, has been dredged open to the sea and a small beach area has been created by dredging on the lee side of the southeast point. These modifications are shown on Figure 2. The Cays and Compass Point are also undeveloped, although the latter is soon to be the site of extensive construction for another marina facility. Land clearing, shoreline alteration and extensive filling have already been accomplished. Presently, most of the Lagoon's north shore is unde- veloped. A horse racing track has been proposed for the flat, formerly swampy, area west of the highway and some filling and grading has been accomplished on that project. Page 9