Table 15. Type of reclamation recently completed or approved for implementation in the central Florida phosphate district (as of November 1979). The sequence of soil strata is shown from top to bottom. Mixed soil types are indicated by hyphens. Reclamation sequence Relative area of reclamation types (percent and total hectares) (top/bottom) 1971-4. 1975. 1976. 1978b 1979bc 1980-89 1990-99" 2000-09 Overburden (area includes some lake surface) 63.8 51.1 53.1 -- 65.9 31.7 8.1 Overburden/sand tailings 1.4 4.0 8.2 28.7 Overburden/sand tailings/clay - Overburden/sand tailings-clay Overburden/clay Overburden-sand tailings Overburden-sand tailings/natural ground Overburden-sand tailings/clay Subtotal 16.7 1.8 16.9 - -- 27.5 9.8 S 4.9 1.2 9.5 5.5 6.4 __ -- 74.7 60.6 67.7 28.7 100.1 9.7 17.9 15.8 Clay/natural ground Clay/sand tailings Subtotal Sand tailings Sand tailings/clay Sand tailings/clay/natural ground Sand tailings-clay Sand tailings-clay/overburden Sand tailings-clay/natural ground Subtotal Peat/sand/tailings/clay Total hectares 2.8 15.3 -- 5.5 12.5 33.2 15.8 5.5 12.9 6.3 12.6 S 65.8 Cr n z 7.5 7.5 4.9 45.6 -2.5 0.0 7.4 45.6 - 0.4 - 11.8 - 1.8 12.9 6.3 12.6 65.8 1565 1037 1742 229 37.9 S 1.5 -- 0.0 15.5 37.9 0.7 982 4408 3704 O z 68.1 68.1 2080 *Phosphate Land Reclamation Study Commission 1978. hBased on release dates in records of the Bureau of Geology. 'Based on scheduled completion dates in records of the Bureau of Geology. --