Elcr 1 city SuI pl.,/. Power of entry for ascertaining quan:tity of celetricity Collsulmed. I,'ectrie linea ,cc. not C trainmble or subject to execution. (4) If any apparatus or equipment and/or installation Ichlo~iing. to a consumer supplied or to be supplied with elec- tricity by ihe Companiy is found to have a lagging power factor of less than 0.8 or a leading power factor in excess of 1.0 in phase re'tion.ship between Kilowattamperes and Kilowatts then the Company may request the consumer in writing to provide a;' Al in all at the consumer's expense such power factor cor- rectiiig equipment necessary to maintain the resultant power factor of the apparatus, equipment and/or the installation within the required limits. Should the consumer not comply with the Company's request within the period stated by the Company, then the electricity supply may be disconnected or not connected as the case mniy l e until tlhe apparatus, equipment and/or the installa- tion meets with the Company's requirements. 20. The Company may at all reasonable times enter upon any laid or premises to which electricity is or has been supplied 1y the Coi'iipay for the purpose of inspecting, testing or main- tainipng the electric liniis, meters, accumulators, fittings and other works anid apparatus thereon belonging to the Company, or of ascertainingg tlie quantity of electricity consumed or supplied in or to such premises or. where a supply of electricity is no longer required or where the Company is entitled to take away and cut off the supply of electricity from any such land or premises, for the purpose of removing any electric lines, meters, acCeumilators, fittings, or other works or apparatus belonging to the Company: Provided that the Company shall repair all damage caused by any such entry, inspection, maintenance or removal and provided further that should anyone wilfully or mali..ouslv place or erct anything which impedes or hinders the easv, entry, inspection, maintenance or removal by the Com- pajy if it properly the CoImpany shall be at liberty to remove the impediment or hindrance in question at the cost of the occupier of the land or premises in question and the Company shall not be responsible for any damage caused there- by. 21. Where man electric lines, meters, accumulators, fittings, or other works or apparatus belonging to the Company are placed for the purpose of supplying or measuring electricity in or uponw any land or premises not being in the possession of the Company, such electric lines, meters, accumulators, fittings or other works or apparatus shall not be subject to distress or to No. 14. 1973.