TABLE 12.--ESTIMATED VARIABLE AND FIXED LABOR AND EQUIPMENT COSTS FOR TRANS- PORTING AND LOADING 100- AND 50-POUND BURLAP BAGS OF POTATOES IN TRUCKS AND RAIL CARS BY SELECTED METHODS AT VARYING RATES OF OUTPUT Low Output Ratea High Output Ratea Hand Hand Item Truck Conveyor Truck Conveyor Method System Method System Variable Costs Cost per hour: Labor $8.000 $4.000 $15.000 $8.000 Electricity .... .120 ...... .240 Repairs .018 .240 .032 .480 Total $8.018 $4.360 $15.032 $8.720 Cost per hundredweight (cents): 2.83 1.54 2.66 1.54 Fixed Costs Replacement costs: Hand trucks $ 360 .... $ 630 .... Conveyor system ... $4698 ... $9396 Built-up floor ... 100 ... 200 Total $ 360 $4798 $ 630 $9596 Annual fixed costs: Hand trucks $ 59 ... $ 104 Conveyor system ... $ 775 ... $1550 Built-up floor ... 12 ... 23 Total $ 59 $ 787 $ 104 $1573 aThe low output rate is equal approximately to that attained with a four-station bagging table using simultaneous filling and weighing; and the high is about equal to the eight-station bagging table. bAssumes that thettotal output is made up of 70 percent 100-pound bags and 30 percent 50-pound bags.