CROP BUDGET PREPARATION FORM Form / of / Name Exmpe' PART (0) Processing System Selection Check a. or b. a. Budget will be prepared completely from forms. _/ b. Old budget will be revised Old Budget Number Check c., d. or e. c. Budget is not to be stored or replaced d. Budget should be stored as a new budget e. Budget should replace old budget of same number Price vector number 1 (default is 1) Machinery complement number 1 (default is 1) PART (2) Title (TITLE) SCORt4 GRAZIA SAMPLE BuPT4Er: NORTH. FLOR'r DA., 9_ '7. PR LC ES W VJELL .DRAZJ'E D SgADAY LOAv Soy M SrLS PART (3) Footnote (FOOT) I, -? 4P T-?R "CrATAR s 10-to- IZs N-P-k r/ nR __V PREPARED BY: