LP2 Phase 1 y = 0.02e"-53x (0.5 years) r = 0.00 p = 0.99 60% - 50% 40% 30% - 20% - 10% 0% 60% 50% - 40% 30% 20% 10% 0% 0% 20% 40% 60% 60% 50% - 40% 30% 20% 10% 0% - 0% HP5 Phase 3 (6 years) 80% 100% y = 0.08eox 2 r = 0.03 p < 0.30 0 0 0- 0a~~ 20% 40% 60% 80% 100% Clear Springs (8 years) y = 0.01e76x r < 0.10 p <0.32 60% 50% 40% 30% - 20% 10%- West Lobe y = 0.05e153X (10 years) r2 = 0.53 p <0.01 0% 20% 40% 60% 80% 100% Soil Water Content Soil Water Content The Relationship Between Soil Water Content and Organic Matter in a Chrono-Sequence of Constructed Forested Wetlands. Sites Are Presented in Chronological Order. 7-70 FGGSB -2 y = 0.01e4.63x 2 (2 years) r = 0.47 p < 0.01 0 50% 100% C07984 (5 years) y = 0.01e2.44 r2 < 0.07 p<0.16 60% 50% S40% 2 30% 0 20%- 0 10% 0% - 0% 50% 100% 60% 50% 40% S30% , 20%- 10% - 0% 50% 100% Figure 7.15. I 1 7 1 1 I I I I