LP2 Phase 1 (0.5 years) y=-1.68x+ 1.89 r= 0.18 p <0.05 2.00- 1.80 1.60 - 1.40 1.20 1.00- 0.80 0.60- 0.40- 0.20 - 0.00 2.00- 1.80- 1.60 - 1.40 - 1.20 - 1.00- 0.80- 0.60- 0.40- 0.20- 0.00 100% FGGSB-2 (2 years) O0 y = -2.80x + 2.00 r = 0.50 p<0.01 50% 100% C07984 (5 years) y = -2.25x + 1.59 T = 0.21 p < 0.05 50% 1.80 1.60 1.40 1.20 1.00 0.80 0.60 0.40 0.20 S 0.00 100% C HP5 Phase 3 (6 years) y .35e-1.73x r = 0.46 p = 0.02 50% Clear Springs (8 Years) -3.38x y = 2.66e-3.3 r = 0.94 \ p < 0.01 50% 1.60 1.40- 1.20 1.00- 0.80 0.60 0.40 0.20 0.00 100% Soil Water Content East Lobe (10 years) y = -1.92x + 1.53 r2 = 0.92 0 p= 0.01 50% Soil Water Content Figure 7.13. The Relationship Between Soil Water Content and Bulk Density in a Chrono-Sequence of Constructed Forested Wetlands. Sites Are Presented in Chronological Order. 7-65 50% 0 o@ 1.80 1.60 1.40 S1.20 ao 1.00 0.80 I S0.60 - m 0.40 - 0.20- 0.00 100% 1.8 1.6 1.4 1.2 1 0.8- S0.6 S0.4- 0.2 0- 0% 100% I I