Table 7.4. Canopy Tree Data Collected from a Chronosequence of Constructed Forested Wetlands. c Lx PROJECT NAME OR NUMBER LP2 Phase 1 0.5 0.7 1060 1057 0.76 0 7 0.69 0.81 *** FGGSB 2 2 1.0 999 998 1.22 *** 5 0.54 0.77 *** C07984 5 1.9 1166 1166 1.69 *** 12 0.75 0.70 64% HP5 Phase 3 6 5.2 1166 766 4.51 57 5 0.50 0.72 41% Clear Springs 8 7.8 1600 506 9.29 74 5 0.43 0.62 *** East Lobe 10 5.4 437 207 6.54 73 3 0.22 0.47 *** West Lobe 10 7.0 667 469 4.14 ,,73 5 0.70 0.85 *** Cateye 12 7.1 1598 748 6.23 73 6 0.62 0.79 17% SP11 14 8.4 1685 583 9.14 83 5 0.64 0.91 6% Guy Branch 15 7.6 1466 714 6.22 *** 2 0.19 0.64 *** SP6 16 7.4 616 499 4.57 83 6 0.46 0.59 9% Morrow Swamp 17 7.8 1062 20 10.77 57 1 0.00 U 38% Sink Branch 18 10.8 951 477 8.70 88 10 0.75 0.75 3% ParcelB 19 10.5 1792 810 9.10 81 10 0.85 0.85 *** *** Data not collected due to inclement weather. U undefined