Table 7.2 (Cont.) Summary of Research Sites. Project Project Name Acreage Mulched Understory Nuisance Cattails Primrose Hydrology Wetland Soils Number (acres) Planted Control Present Present History LP2 Phase 1 **** Y N N N Y fringing reclaimed sand tailings FGGSB2 **** 38.50 Y N 1998 Y Y depressional reclaimed sand tailings C07984 **** 0.76 Y Y 1997 Y Y seep reclaimed overburden HP5 Phase 3 2.00 Y N 1992 N Y fringing reclaimed **** Clear Springs Seep **** **** N **** N Y seep reclaimed sand tailings SP 1 East Lobe **** N N Y Y Y depressional clay settling pond clay SP 1 West Lobe **** N N Y N Y depressional clay settling pond clay **** Cateye **** **** **** **** N Y stream reclaimed SP11 **** **** **** **** **** N Y fringing reclaimed NPS1 Guy Branch **** **** **** **** Y Y stream reclaimed SP6 Gardinier 1.80 Y N **** N Y depressional reclaimed FG13 Morrow Swamp 150.00 Y Y Y Y Y depressional reclaimed **** Sink Branch **** Y **** N N Y stream reclaimed sand/clay **** Parcel B 50.00 N Y **** N Y depressional reclaimed sand/clay After mining, Parcel B was backfilled with overburden to create approximately 4 ha of wetlands within the 20 ha site. The site was not mulched but was revegetated with both a variety of tree species and five herbaceous species.