REPORT OF INVESTIGATIONS NO. 42 the peak for Hillsborough. River near Tampa was on March 21. The flood peak at the Tampa station occurred about two days later than that at the Withlacoochee-Hillsborough overflow and about 3 days later than that at the Zephyrhills station. The gaging station near Tampa is in the upper pool at the waterworks dam. In March 1960, the stage of the upper pool was regulated between narrow limits by tainter gates and flashboards. A stage-discharge relation was defined at 22nd Street, 0.5 mile downstream from the dam, by measurements made during the floods of 1959 and 1960. Mean daily discharges for the gaging station at the dam were used with the stage-discharge relation to compute the stage hydrograph for 22nd Street as shown in figure 56. | o __________________ ___ __ ^ ^ ^ -________ 16 10 EXPLANATION Mean daolly stage at 22nd Street computed from mean daily discharge at gaging 6 station 0.5 mile upstream. Mean daily stage at 22nd Street inferred from discharges at gaging station adjusted 4 for no flow ot Withlacoochee- Hillsborough overflow. S 1 1 1 1 I I I I I 17 18 19 20 21 .-22 23 24 '25 26 27 28 March 1960 29 30 31 Hydrographs of computed mean daily stage of Hillsborough River at 22nd Street,-Tampa, flood-of March 1960. 16 Figure 56.