156 Corozal Antenna Field, prior to the entry into force of the Agreement, which would require construction of piers, docks, quays, or any similar structures along the banks of the Canal or within 250 feet of such banks. (b) it is understood that the installations, shipyards, buildings, and equipment within said buildings, which make up the Naval Industrial Reserve Shipyard and which, in accordance with Article V of the Agreement, shall be made available to the United States in event of a defense emergency, include the following facilities: Drydocks 1, 2, and 3; Docks 7, 8, 12, and 13; Cranes D-4 and D-19-N; Buildings 1, 1A, 1C, 1D, 1G, lH, IJ, 30, 17, 31, 20, 18, 2, 2A, 3, 4, 4B, 29, 25, 16, 11, 23, 12, 29B, 12A, 12X, and 13; the transfer table and capstans. It is understood, however, that only those of the above facilities which have been transferred to the Republic of Panama shall be deemed to be included within the Naval Industrial Reserve Shipyard for the purposes of paragraph 2(g) of Article V of the Agreement. (c) it is understood that the Republic of Panama will permit the American Legion and the Balboa Yacht Club to continue their operations in Building 1370 and the adjacent facilities, unless otherwise agreed in the Ports and Railroads Committee. 21. With reference to Attachnent 2 to Annex B, it is understood that the United States nay use Pier 8 in the Port of Cristobal for berthing and handling cargo for the SS Cristobal, or for any successor to it, on a priority basis. TIAS 10031