118 (b) Facilities. (i) Drydock No. 1, including all of the following facilities, equipment and utilities required to support its operation: (A) Drydock Miter Gates and two electric motors and mechanical systems for opening and closing the gates. (B) Fifty keel blocks and one hundred and fifty hauling blocks, including all hauling block tracks, chain sheaves, brackets, hauling chains, and blocking dogs. (C) Ten capstans. (D) Flooding/dewatering tunnels. (E) Four dewatering pumps, two drainage pumps, and one salt water pump. (F) All valves, bulkheads, and screens in the flooding and dewatering system. (G) Three stationary 1,600 CFM Joy Air Compressors. (H) One elevator. (I) Sixteen portable rain sheds. (J) Dock 8. (K) All electrical switch gear, power systems, water and compressed air piping, and h control systems located in Building 29, the Drydock a (ii) Buildings: Numbers Description 1 Machine Shop 1-C Facilities Building (. 1-D Launch Repair lighting and ydraulic nd Dock 8. Storage) TIAS 10031