PANAMA RAIL ROAD COMPANY... _ ; LO] EXPENDED See Ae | : This Year. To Date. 1462 Change Plumbing, Panama Freight Station............. ? $283 31 $283 31 1463 Overkaul:S:-S:. “Gen: HE: Hodves.. +. 3 135,067 93 135,067 93 1464 Erect: Cow Shed at Mindi Dairy... ..: 20... 3. acct e.. aS 1,266 12 . 1,266 12 1465 Convert Feeding Pen 7101 at Mareanite Hog Farm into a Cormme@nibesekcnciecs Se ee i ee 246 42 | 246 42 1466 | Install, Boiler and Tubs in @uarters. Gatun Station....... 325 07 325 07 1467 Repair Windows in Storeroom of Building 100—Colon. 538 98 538 98 1468 Construct Ramp from Panama Freight Station to Street. . 141 55 141 55 1469 Repair BarcesCo and lO ee ie ae ee ee 38,501 89 3,501 89° - 1470 Install Fuel Oil System, Hotel Washington.............. 674 867 674 86 1474 Install Merrick Weightometer—Cristobal CRP eee ee ee 4,574 70 4,574 70 1475 ‘Lakezup: West: Sideclracks 3.2223 ee ee 3,139 92 3,139 92 1476 DemolishsBontoon Bridges... 6. es , 894 19° |~ 394 19 1477 Construct Temporary Platform, Ft. Clayton............. 330 27 330 27 1478 Telephone Cables to New Silver Town, Mt. Hope.+..... =. 1,615 83 1,615 83 1479 Repair and Paint American Consulate Builds !Celon 334 41 334 41 1480 Repaitco Oss Caribbean 4. eset ae 51,909 79 51,909 79 1481 Construct New Yard Office—Cristobal.................. 3,504 90 3,504 90 1482 Convert R. R. Signals from Double to Single Track, Pedro MicuelstosPanaim anise ce oe 5 ee ee 6,288 16 6,288 16 1484 Rearrange Duct Line Circuits, Gamboa and Chagres River - = CTOSSHNG Se ao ee cee oe ee ne eae 33281206 320k OF = 1485 Lay Barrett Specification Roof on Hotel Washington...... 5,051 22 5,051 22 - 1486 Extend Telephone Circuits, Pedro Miguel District........ 340 41 340 -41 1487 ConstructzHish-Room, balboa C2 s= eee ee Zoo ‘2,201 Sl” 1488 Install Telephone Cable Old Washington Hotel to Bachelor GirlssQuarters; Colon beach = 171 97 171 97 1489 Repair Floating Pile Driver No. 198................. Bee 2,229 62 2,229 62 1490 FUAISC =D AES Ce LAB ee ee ces era hs RO eee Maes eee ate 1,415 55 PA4th. 55 1492 Construct:track-to:Colonastables.= <-.. 6... 1,927 65 1,927 65 1493 Repair Chill Room, Mt. Hope, ©. S:-P. 26 8,019 41 8,019 41 1495 Install Door and Window in Storeroom, Building 100, Colon. 186 55 186 55 1497 Install’ Machinery, Cristobal Laundry.:.................. 24, 329 48 24,329 48 $968,084 51 | $4,260,268 21 Note () Indicates Decrease. STEAMSHIP OPERATIONS. GROSS GRoss Net REVENUE. EXPENSES. INCOME: RO ile eee See errr aen cc ee ee Hate teres $5,156,446 84 $5,857,257 06 *$700,810 22 1OQO eee ote Besa era aires Caeser meee 6,560,557 06 6,839,078 76 278 521 70 Decresse-<- eee $1,404,110 22 COST RIe V0 2 ee Increase. . ee a eo et ge ee | a ee aa | es acs seat yea *$492 288 52 «Deficit. STEAMSHIP LINE. The total operating revenues of the Company’s line were $4,992,751.12, a decrease of $1,344,036.54, or 21.21 per cent. as compared with the twelve months ending June 30, 1920. Freight traffic decreased 219,097 tons,-or 34.54 per cent. while the revenue derived therefrom decreased $1, 191, 241.23, or 22.72 per cent. Passengers show a decrease of 761 in the number carried, or 6.61 per cent. and an increase in revenue of $70,366.80, or 15.65 per cent. Revenue from the transportation of mails shows a decrease of $43,- 094.32, or 18.41 per cent., while revenue from treasure shows a decrease of $28, 253. 09, or 39.17 per cent. Of the total tonnage transported 314,877 tons were carried by the Company’s steamers and 100,282 by chartered steamers in the twelve months ending June 30, 1921. In the previous fiscal period the former carried 308,047 tons and the latter 326,209.