PANAMA RAIL ROAD COMPANY. 2 9 Expenditures for fuel decreased approximately $61,000.00 due to the decrease of 40,000 miles in engine mileage and a reduction in the use of coal in favor of oil, Personal injury claims increased $5,000.00 and loss and damage frezght increased $1,500.00. The following table shows the number of trains handled: ~ 3 PASSENGER. - FREIGHT. —_—— GRAND 2 P. C. {| Other | Toran. : s Regular.| Special.| Total. |Regular.| Work. | Work. | Total. Northbound Ea pe ene eee ya 6,029 75 | 6,104 | 1,448 BuO 479° |: 27302 8,406. Southbound..3.-.....-....: 6,026 114 | 6,140 | 1,412 375 479 2,266 8,406 Mota ce, se eee sets mee 12,055 189 | 12,244 | 2,860 750 | 958 |} 4,568 | 16,812 Total Prior Year............ 11,927 189 | 12,116 | 2,748 552 335 3,635 | 15,751 Increase...... Ree te 128 — 128 ne 198 | 623 933 1,061 Decreases ee a sate st ss ie goes ies mos Average Number per Day,1920} 32.9 oD 33.4 eee 2.05 2.61 12.4 45.9 Average Number per Day,1919| 32.7 | 20 Boe Weed 1.5 9 10. 43.2 INCTCASC eens ae ieee oe <= oe .2 .55 1.71 2.4 | Qi DOcKedse sls — sos a ae Bes rie eS pth MAINTENANCE OF WAY AND STRUCTURES. The total amount expended under this heading was $263,058.63 against which credit was allowed for material recovered, etc., amounting to $17,996.18, leaving a net cost for the upkeep of road and rail road build-. ings amounting to $245,062.50, an increase of $59,000.00. Actual track work increased approximately BIR 000.00, repairs to bridges and |buildings $11,000.00, and signal and interlocking plants 1$6,000.00, due to the increased cost of labor and material: ; Superintendence also increased approx- imately $4, 000.00 over last year. REPORT OF THE ROADMASTER. - This department maintains and constructs all tracks for the Par Railroad, The Panama Canal and the Army; also takes care of the bridges and buildings and repairs to docks at the harbor terminals. Report of trackage in use by the Panama Rail Road, The Panama. Canal and the U. S. Army: Operated Tine: MILES. Mam®=Line-=Colonsto Panama eo oe eR eeu ee renee 47.61 ‘Second Main Line—Pedro Miguel to Panama............ ese e eee ee eee eee ot: Atlantic: erminals—Colon. 2.33 ee Rie te eek a an a 6.93 Cristobal and Mindi Teland iat ose oe oe eee ciel emer es ee ere arae eC 32.68 Pacificsterminals—=Pan ama sce eae ee ns nea ake ek ete eee oe a Qe 125: : Ballo aire ce. kee ee te ts eee Beate oe Rate sa eet 10.31 Intermediate Sidings—Colonm to: Panama. <.\..... oe ee ec ee os oe 12.21 3 “Rotal:-Panama Railroad bines.. oc) ee ls re Se ae ae 126.23- Leased Line: i Miugs. ; Olid Main Line—Bas Obispo to Pedro Miguel ..........-. sss eset eet 9.12 Intermediate Sidings... 5 4. 2.5 5 oe os is wl es gee hen ner 2.95 Total Leased Line.. ee eae ee a eae aN esa ean ee 12.07 Panama Canal and U. 8. Army Tracks Maintained by Panama Railroad: Atlantic Terminals......... Stary NE SOLO Te RCs ak cas Nahas ls ualtapnewey eNes shia ons ears 11.21 Intermediate Sidings.............. Sra ae SS Re sis eter andes ses aeanarsn ute cti sae wae“e sce 25.56 RacthoPenmimal goss... 0%. pac oe a oe ane ae ee es aps ee VES eee 28.80 ERO tO eee a a ree ee ec aaa era eee Sede aun ns Savon ana ce eis uw gus at oiecece 65.57 ¢