REPORT OF THE PANAMA RATLROAD COMPANY. 13 to let the work of building construction, by contract, to the Central American Construction Co. (litd.), L. Ly Jewel, president, at a cost of $81,500. This ccecpariieay | is also charged with the general maintenance of all bridges and buildings pertaining to the operated line, em- ployees’ quarters in Colon and Panama, and also construction and repair work in connection with the cold-storage plant operated by the commissary department at Cristobal. Work has progressed under the following A. F. E.’s, both current at the beginning of the year and issued during the year: ARY. Es. No. Class of work. ‘emodeling steel pier at: Balboa.) 2-32-23... oe: Eee ae Remodeling 8 Shaw cranes at Balboa... - 2. ee Soundings and preliminary investigations, Cristobal (credit) Saree ee ony Rape peas HxtendingaD ockal Coloma cn cee ea ce eet ee eee Remy Preliminary work for new Hotel Washineton; Colon. o: atu ok eae ee Construction office building for California-Atlantic Steamship Co., Balboa.....- Construction washhouse for buildings 60, 61, and McKinley House, Colony: Installing additional interlocking plant, Balboa gunchions: 22) ee Hire protection. of Americas Whark Panama see: cu os es ee Additional story, Pacific Mail Steamship CoZs' oiice; Balboa 22273354. eee Ofticetor dock foreman-at; Dock lil OristODalese 2.0. 6 ee To lay additional track on lumber dock, Bal Dogs ee es ee Se a Swimming pool, sea wall, and sidewalk, Colon: Beaeh:: 20 S55 Meee oe SS Installing gates for turnstiles, Colon depot Bee Gmetad ek COPED MN Gee yea rete aN Ohne Constructioncolstables; di StusOnecs: sneo. foe ee ee ee ee Painting Merion Of-HOuse G=As eros oe eee esis ye aa ee ene Construction oradditional room at Gatun depot... 2.26. 42.0. <= eee | Construction of fireproof building—s family apartments and 5 stores for rent, Colom es ee Oe oe eg ER Ua ae ae cE Construction of new concrete commissary building, Cristobal........-.. hues ees Construction ofnew dockss Cristobal 225 5 ae Painting intenmornot HOUSe O-bs <5 ke ee nn eae ee New roof, Panama freight house.........-- wee we eee ewe ee we tee ee Amount. $15, 358. 33 182, 92 609. 98 60, 167. 96 2,876. 95 710, 974. 50 60 Additional sheds, Panama depot (included in A. F. BE. OSS) esas vista eels ee ae chee eae Construction: Ormovor HOUSe: COLON ia ee ye are ee te Driving piles for tying up tug Phoenix Dock f-Growork GONG) 25222 ee ee te ice Work on borings, Atlantic Terminal coal pier... ... 22.222... 2... eee ee eee Construction ofnew Hotel Washington; Colon. 3.2420 22 ses. ees eek Constructionsoinew: depot; Panama... sae. se ee ek ee ee ‘| cA Gition al shed a6 7D OC kdl se aya RRS SS RC ao EN Oe geome 3, 791.02 128,705. 59 27, 463.77 3, 715. 65 Repairs to trestle at cold storage, Cristobal (no work done)..........-..-.-----.|.---2-0--- eee Recovering material from old main line, account Isthmian Canal Commission - - Installing water-closet.at commissary, Cristobal. .:-. 22.202. 23. 322. see tee Platiorm:-alongssideof Dock 4. Colows:: . 42g. aes ne ta tees joe ears Osea Installation of automatic block SISTIAIS MASS e oe er Os rae hie ata eeecera re eter Dredging of slip between Dock 16 and Pier 17, Cristobal: Isthmign, Canal:Commission. 3-2... cn Soe tree ve eee $25, 214.85 _ Engineering Department..-..... NES AG eS UE Re RE erator 346. 32’ Alterations im tollet at commissary, CristObal.:. 22-22... 22 96ers ee Hrecting Shaw cramesia Balbontess. sheik ee os Se ae Seo e ek teas eee ae Construction of building for electric motors, Balboa......-.-...-.-------------- installine-water crane at Cristovale 2... sons 28 es Vee ese ee ack we eee eas 34, 039. 95 342. 23 4,026. 22 4) 861. 73 25, 561. 17 146. 43 11, 503. 90 Grading south side, Hotel. Washington (no work Gone) ..5. 2-23. ee cee oleae eu eee Rebuilding interlocking plant at Matachin Junction............-..-...-.-.-.-.- Changes in tower A Cristobal, and addition of one signal at Mount Hope (no WOOP KCL OTOP ga Seidl 3 wea ere aap cve e etisio chs me esate eee ced mite |e cee emia Cari ree Construction of conerete ice DOR BEAR AN AIAN ek Se Ne a ea ee se ete tenet Concreting alleyways, Las Esplanadas, Panama.................--.------.----- Construchom ofskew Span, Drd&e o/e. 2222 ace eee pe tee renee